Railroaders place to shoot the shit.

Members Login
Username 
 
Password 
    Remember Me  
Post Info TOPIC: CSX eyes more double-stacked service


500 - Internal Server Error

Status: Offline
Posts: 36516
Date:
CSX eyes more double-stacked service
Permalink  
 


CSX eyes more double-stacked service
WASHINGTON - A proposal to expand the amount of freight chugging through the District is gaining steam, offering a promise of clearing tractor-trailers off the regions congested highways and improving commuter train service, the Examiner reports.

It also would mean rebuilding some railroad bridges around the region, including the Virginia Avenue tunnel just south of the Capitol.

CSX is proposing an $842 million plan to raise roofs on bridges and lower some railroad tracks across the mid-Atlantic so that it could carry double-stacked cargo containers on its trains.

Locally, that would mean millions of dollars in construction work. The Washington region has some of the worst railroad bottlenecks along the East Coast, including the Virginia Avenue tunnel.

Raising the roof of that tunnel alone would cost an estimated $140 million. The 12 other local projects proposed, including replacing the bridge on Deer Park Drive in Montgomery Countys historic Washington Grove, would add millions more.

The freight company would pay about $393 million of the National Gateway initiative, while state and federal dollars would pay the rest. The project is seeking stimulus dollars for some of the costs.

CSX is proposing projects at the following locations that would replace bridges, raise roofs of tunnels, or lower tracks into the ground so double-stacked freight trains could travel the route.

Governors in Maryland, Virginia and other states already have backed the plan. It also has won support from the National Capital Region Transportation Planning Board, a key regional group of local officials and planners.

We support the project even though it wouldnt benefit the District, said District Department of Transportation spokesman John Lisle. We recognize there are regional and national benefits from it.

The plan would add traffic, congestion and headaches during construction, but local officials are hoping it could mean fewer trucks on the roads, plus better commuter and passenger train service.

Officials estimate the proposal could shift 70,000 trucks off Washington-area roads, as one train can carry the load of more than 280 trucks, according to CSX. The trains are also more fuel-efficient per pound, they say, getting 436 miles to the gallon for each ton of cargo.

But the approval means more freight traffic through the heart of Washington, which has been seen as an eyesore and homeland security nightmare. The trains that can carry hazardous materials run close to national monuments and key government offices, a security concern given the possibility of derailments or terrorism.

A 2007 feasibility study by the National Capital Planning Commission that proposed alternatives for a 7-mile stretch of railroad foundered when it estimated that burying the tracks underground would cost about $5.3 billion. Marylanders also balked at rerouting the tracks through their state.

The railroad company hopes to complete the initiative in time for the Panama Canal expansion due in 2015 that will bring more cargo to the East Coast, CSX spokesman Bob Sullivan said.

(This item appeared in the Examiner Sept. 21, 2009.)

 

September 21, 2009


__________________

© Equal Opportunity Annoyer

Troll The Anti-Fast Freight Freddie

 

 

 

 



Unstable & Irrational

Status: Offline
Posts: 10782
Date:
Permalink  
 

Screw them, I wan them to pick up the whole tab.

__________________

I started ophph with nuthin, and I can safely say I have most of it left....
<img



Upgraded Condition?

Status: Offline
Posts: 9217
Date:
Permalink  
 

Freddie Krueger wrote:

Screw them, I wan them to pick up the whole tab.



The state of Pennsylvania and the Federal Govt teamed up with Gonerail years ago and gave double stack clearances to what is now NS in direct competition with us.
If they helped Gonerail, they can sure help us.
It'll go Nucking Futz around here when they get er dun.
Theyve been out all week last week in our tunnels measuring them.
They have the 4 legged stands with the camera? on them. but they dont just have 1 like a surveor would have and another guy walking around with a yardstick thing.  They got these 4 legged things set up every 100 feet and they are all connected to a central computing device and GPS. We got stopped for an hour last week while they were in Randolph tunnel doing a scan.
HELL YA!! I'd love a gravy turn on a doublestack assigned turn.
On and off 55, 60 mph...GET R DUN!!
  

 



__________________

 This is the official end of my post.  



Unstable & Irrational

Status: Offline
Posts: 10782
Date:
Permalink  
 

Nah, I am a bidder ole man, they can go screw themselves. They have to go far in changing my attitude about their criminal behavior. Welfare mudders.

__________________

I started ophph with nuthin, and I can safely say I have most of it left....
<img



Force Majeure

Status: Offline
Posts: 23412
Date:
Permalink  
 

Clalvin, they don't run Railpax trains that fast out there in the flatlands, do they?

__________________

 I think LAMCo is done with the neo-nazi CSX rejects -- Pipes FC 8/5/23



Purveyor of Positive Attitudes

Status: Offline
Posts: 2839
Date:
Permalink  
 

They probably do, once.

__________________

Some people say I have a bad attitude. Those people are stupid.

Page 1 of 1  sorted by
 
Quick Reply

Please log in to post quick replies.

Chatbox
Please log in to join the chat!