In Europe and Australia the story would read "man beat woman to death with a railroad sleeper".
I'm sure somebody here knows what a wooden railroad tie/sleeper weighs. I'm thinking 300-500lbs.
I'm thinking the killer was strong enough to lift one end up high over the victim and just let go.
Nobody other than Superman could pick up a railroad tie/sleeper like a baseball bat and use it
to kilt somebody.
__________________
If you are in a horror movie, you make bad decisions, its what you do.
Worked a section gang back east one summer. Pulling ties, and sliding new/used good ones in as replacements, onedood could 'pull' one out with tongs. But Lifting 'em, nope! Decent, good ones weigh between 180-250 lbs.
We'd dig out ballast from one end, pop spikes, and out they go, ta rot aside the ROW. Newer/good/used ties would be slipped in from the opposite end, then jacked up, plates placed on, pilot holes drilled, new spikes placed, and the best 'windmill' would drive 'em home!
Phun schitt. Until ya smack the railheads instead of the spike heads! Worst railroad job ever!
__________________
Hmm. That address doesnt look right. It looks like the link pointing here was faulty.
When I sampled that job we jacked up the rail first then pulled the spikes and attempted to slide the tie outit out, it was a lot easier to break the tie loose from the roadway (specially if it was more cinders than ballast)
We always slid the new tie back into the hole the old one came out, those fukin ballast rakes were great to dig with, but why do it if ya dont haffta?
Once the replacement tie was in place, throw the tie plates on, kick the jacks down dropping the rail onto the tieplate/tie then hammer the spikes in. Drill a hole for the spike? Never seen it done.
Maybbe if yer guys used hammers instead of a spike maul..... Then after ya replace the days quota ya get ta find out how to line and level track. And remember, only the BOSSMAN can eyeball the track.